Within the framework of "Climate Change Mitigation in Ukraine through Energy Efficiency in Municipal District Heating Project (the pilot project in the city of Rivne)" which is carried out at support of the Global Ecological Fund, the Un Development Programme as the organization-performer and ,,The Municipal Energy Service Company of Rivne" Closed Joint-Stock Company as the recipient, have started putting into practice the demonstration project aiming at confirming availability of profitable potential of energy efficiency.
"ESCO-Rivne" CJSC has accomplished projects amounting to 1,5 million USD. While doing them there was achieved not economic effect all alone but also ecological and social one:
- energy saving made 4 000,6 tons of conditional fuel;
- economic effect up to 145 000 UAH per month;
- oxide of carbon diminished by 685 000,2 tons.
More than 50000 people of Rivne , the residents of Pivnichny District and the central part of the city, became aware of the improved service quality of hot water supply and heat.
These results were achieved while putting into practice a wide range of various projects. They are as follows:
- large projects such as construction of the first steam generating station (SGS) in Rivne on the basis of the existing boiler- house, the installation of the up-to-date heating pipelines;
- medium projects such as reconstructing the central heat station (CHS) and arranging individual heat substations (IHS) in 5 residential buildings;
- small projects, such as installing the assembly of units recording and regulating heat energy of at schools of the city and also the devices of frequency regulation and motors’ operation.
To carry out these projects there were implemented the following contracts:
|
|
|

The district heating pipelines were installed between the boiler plant at 71 Kn. Volodymyr
St. and the heat-network chamber No 39 in Rivne.
The contract value makes – 787 542,20 USD.
The customer is
"Komunenergia" DHC, the city of Rivne.
The contractor is
“ESCO-Rivne" CJSC and Energoresursinvest" Company from the city of Lviv.
The heating pipelines have been made of steel pipes, 350 mm in diameter and 1 321,5 m long.
The pipes were pre-insulated with isocyanate foam in polyethylene, zinc-coated helical casing. Putting the heating pipelines into operation gave possibility to provide day and night hot water supply in winter and summer periods and heat in winter and summer periods Pivnichniy District and the district of Fabrichna St. and those around the The Flax Processing Plant in the city of Rivne.
This contract execution allowed to save:
·
heat energy – 545 Gcal/per year;
·
funds - 101 200 UAH/per month;
·
CO2 emissiion - 132 t/per year.
|
|
|
|

Rehabilitation and renovation of the automation and control system of the boiler units installed in the boiler-house at 71 Kn. Volodymyr St. in the city of Rivne.
The contract value makes – 72 295,00 USD
The customer is
"Komunenergia" DHC, the city of Rivne.
The contractor is
"ESCO-Rivne" CJSC and “Spektr TV" Company, the city of Rivne.
The main task of the automatic control and alarm system for the boiler units is:
-
measuring and alarm signalling of deviations from tolerance values of basic parameters when a boiler operates;
-
nological protection which causes the boiler stop blocking in accordance with acting normative documents;
-
automatic boiler ignition;
-
automatic dilution control in the boiler’s burner;
-
automatic steam pressure control in the boiler’s drum;
-
automatic ratio control between the amount of gas and air, which are given on a gas-ring optimizing the process of burning;
-
signalling of equipment and steel framework behaviour in service;
-
emergency signalling when fixing deviations of the boilers’ operation parameters being controlled in case of tolerance; the alarm system itself warning emergency by sound;
-
the alarm system itself warning emergency by sound;
-
indication and registration of boiler operation parameters.
This contract execution allowed to save:
·
fuel (natural gas) – 423 000,6 m3/per year;
·
funds - 101 200 UAH/per month;
·
CO2 emission -793 t/per year.
|
|
|
|

Rehabilitation and renovation of the boiler units installed in the boiler-house at 71
Kn. Volodymyr St., in Rivne.
The contract value makes 79 245, 60 USD.
The customer is
"Komunenergia" DHC, the city of Rivne.
The contractor is
ESCO-Rivne" CJSC and “Kotloenergoprojekt" Company, the city of Kharkiv.
In the boiler plant 4 steam boilers of the B 25/15 GM type were installed. Before this
implementation steam consumption by the boilers of the 25/15 GM type made
25 t/per hour.
While rehabilitating and renovating the boiler units there were carried out the
following kinds of work:
·
replacement of the initial part of the super heater and the dipping pipes of the dashers;
·
rehabilitation and renovation of the remote cyclones;
·
replacement of the economizer and the inlet collectors of the furnace dashers.
This contract execution gave the possibility of increasing power and steam pressure in two boilers. Steam consumption after rehabilitation and renovation of the boilers makes 28 t/per hour.
This contract execution allowed to save:
·
fuel (natural gas) – 423 000,6 m3/per year;
·
funds - 101 200 UAH/per year;
·
CO2 emission- 793 t/per year.
|
|
|
|

Rehabilitation and renovation of the gas burners for boiler units installed in the boiler-house at
71 Kn. Volodymyr St. in the city of Rivne
The contract value makes 33 933, 60 USD
The customer is
"Komunenergia" DHC, the city of Rivne.
The contractor is
"ESCO-Rivne" CJSC and Kotloenergoprojekt" Company, the city of
Kharkiv.
This contract execution gave possibility to improve the process of natural gas burning that in its turn reduced C02 emission in to atmosphere.
This contract execution allowed to save:
·
fuel (natural gas) – 423 000,6 m3/per year;
·
funds - 101 200 UAH/per month;
·
CO2 emission - 793 t/per year.
|
|
|
|

Implementation of the variable speed drive system for forced draught units and supply-line pumps in the boiler-house at 71 Kn. Volodymyr St, in the city of Rivne
The contract value makes 49 534, 00 USD/
The customer is
"Komunenergia" DHC, the city of Rivne.
The contractor is
"ESCO-Rivne" CJSC and “Spektr TV”Company, the city of Rivne.
The contract execution allowed to cut down daily electric power consumption by 20% due to optimization of forced draught units’ and supply-line operation.
The basic functions of a frequency transformer are:
·
start, stop, dynamic braking, braking to dead stop and adjusting motor’s speed;
·
energy saving, electric hydraulic control ( velocity flow and pressure);
·
succession of braking;
·
control of feed back speed by a tachometer or an impulse-type detector;
·
operation in "faster-slower” rate, S and U-like curve of drag acceleration, step by step operation conditions;
·
automatic “claw” of movable loading and finding the optimum one (“claw” of run);
·
automatic time limitation at low speed while operating, motor’s and frequency transformer’s protection.
This contract execution allowed to save:
·
electric power -201 600 kWh/per year;
·
funds - 101 200 UAH/per month.
|
|
|
|
Reconstruction of the CHS located at 5 Mitskevitch St. in the city of Rivne
The contract value makes 13 744.00 USD.
The customer is
"Komunenergia" DHC, the city of Rivne.
The contractor is
"ESCO-Rivne" CJSC and “Pivdenteploenergomontazh”, the city of Kyiv.
This contract execution allowed to dismount the out-of-date equipment and begin arranging individual heat substations in the residential buildings at 5, 7 Mitskevitch St.
In addition it allowed to change two-pipe heating system , i.e. the heating pipelines were laid out of up-to-date pre- insulated ones to the residential buildings at 5,7 Mitskevitch St which in its turn saves heat energy in comparison with the four-pipe heating system.
The contract execution allowed to save:
·
heat energy - 74,2 Gcal/per year;
·
funds - 101 200 UAH/per month;
·
CO2 emission – 18 t/per year.
|
|
|
|
Arrangement of the IHS in the residential building at 5 Mitskevitch St. in the city of Rivne
The contract value makes 16 338, 00 USD.
The customer is
"Komunenergia" DHC, the city of Rivne.
The contractor is
"ESCO-Rivne" CJSC and “International Centre of Energy Efficient Technologies” Consortium.
The contract execution allowed to provide day and night hot water-supply of the building owing to:
·
arranging up-to-date heat exchange equipment;
·
arranging the up-to-date assembly of units recording and regulating heat energy;
·
applying up-to-date pump equipment, that in its turn saves electric power.
In addition, it allowed to change the two-pipe heat supply system for the four-pipe one. From the central heating plant heat was transported into the system of heating and hot water supply).
It’ll permit to reduce heat energy loss while transporting it to the consumers.
This contract execution allowed to save:
·
electric power – 180 600,0 kWh/per year;
·
funds - 101 200 UAH/per month.
|
|
|

Arrangement of the IHS in the residential building at 7 Mitskevich St. in the city of Rivne.
The contract value makes
16'338.00
USD
The customer is "Komunenergia" DHC, the city of Rivne.
The contractor is "ESCO-Rivne" CJSC and “International Centre of Energy Efficient Technologies” Consortium.
Консорціумом "Міжнародний центр енергоефективних технологій".
The contract execution allowed to provide day and night hot water-supply of the building owing to:
·
arranging up-to-date heat exchange equipment;
·
arranging the up-to-date assembly of units recording and regulating heat energy ;
·
applying up-to-date pump equipment, that in its turn saves electric power.
In addition, it allowed to change the two-pipe heat supply system for the four-pipe one (from the central heating plant heat was transported into
the system of heating and hot water supply). It’ll permit to reduce heat energy loss while transporting it to the consumers.
This contract execution allowed to save:
·
electric power – 180 600,0 kWh/per year;
·
funds - 101 200 UAH/per year.
|
|
|
|
Installation of the IHS in the residential buildings at 42, 77 Kyivska St. and 42 Dubenska St. in the city of Rivne.
The contract value makes
19 080.00
USD
The customer is
the Municipility of Rivne.
The contractor is
“ESCO-Rivne” CSJV.
Carrying out this contract made the heat supply in the residential buildings better owing to installing the up-to- date
heat energy meter and the injection heat exchanger. The heat exchanger is used for preheating water in the heating system. Due to the instant heat transport
from the original heat source (steam, condenser, overheated water) to the secondary heat source (water in the heating pipelines of the arranged unit).
Using the heat exchanger and the pump also gave us the possibility to regulate the heat supply system in these residential buildings.
This contract execution allowed to save:
·
heat energy -74,2 G cal/per year;
·
funds-101 200 UAH/per month;
·
CO2 emission – 18 t/per year.
|
|
|
|

Heat insulation of the pipelines in the boiler-house located at 71 Kn. Volodymyr St.
The contract value makes
65 000 UAH.
The customer is “Komunenergia” DHC.
The contractor is
“ESCO-Rivne” CSJV.
This contract execution allowed to decrease heat loss through the pipeline
that in its turn provided stable boilers’ operation and saved fuel.
This contract execution allowed to save:
·
heat energy - 48 G cal/per year;
·
funds- 2 520 UAH/per year;
·
CO2 emission - 13 t/per year.
|
|
|
|

To carry out setting of the boiler of the B25/15GM type in the boiler-house located at 71 Kn. Volodymyr St.
The contract value makes
51 176 UAH.
The customer is “Komunenergia” DHC.
The contractor is
“ESCO-Rivne” CSJV.
Implementation of this work allowed to provide better heat insulation of the boiler ,
decrease heat energy loss, stabilize boiler’s operation and save fuel consumption.
This contract execution allowed to save:
·
heat energy - 50 G cal/per year;
·
funds- 2 583 UAH/per year;
·
CO2 emission - 13 t/per year.
|
|
|
|
Reconstruction of the heat substation located at 6 Kavkazka St.
The contract value makes
340 000 UAH.
The customer is “Komunenergia” DHC.
The contractor is
“ESCO-Rivne” CSJV.
At this stage there was carried out some project work having the value of 24 410,62 UAH.
Within the bounds of the project the CHS has been reconstructed located at 6 Kavkazka St. in the city of Rivne having up-to-date heat exchange and pump equipment.
Arranging the up-to-date heat exchange equipment will considerably allow to decrease heat loss which will accordingly improve heat supply of the buildings.
Arranging up-to-date pump equipment will raise the efficiency of heat energy consumption and decrease that of electrical energy.
In addition heat energy regulation according to temperature conditions has been implemented to save electrical energy.
This contract execution allowed to save:
-
heat energy – 1 468 G cal/per year;
-
funds- 75 822 UAH/per year;
-
CO2 emission - 375 t/per year. |
|
|
|

Installing the commercial assembly of units for recording and regulating heat energy.
The contract value makes
29 687,55 UAH.
The customer is
the Department of Education, the city of Rivne.
The contractor is
“ESCO-Rivne” CSJV.
The assembly for measuring and regulating heat energy in the heating system at School №26
has included the following:
-
the SONOCAL 2000 microprocessor unit in the set with the ultrasonic meter made by “Danfoss” Firm;
-
the INFOCAL electronic regulator in the set with the regulating valve of the VB2 type, 50 mm in diameter made by “Danfoss” Firm;
-
the circulating pump of the BPH type made by "DAB” Firm.
Installing the commercial assembly of units for measuring and
controlling heat energy allows to optimize the temperature conditions at school within a day. It allowed to decrease schoolchildren’s
sick rate in a winter period.
This contract execution allowed to save:
-
heat energy – 435 G cal/per year;
-
funds- 36 560 UAH/per year;
-
CO2 emission - 111 t/per year. |
|
|
|

Reconstruction of sewage and water purifying system in the city of Ostrog.
The contract value makes
9 500,00 USD
The customer is
Ostrog Municipal Enterprise “Vodokanal” (Water Supply Station).
The contractor is
“ESCO-Rivne” CSJV.
The Contract’s implementation has allowed:
This contract execution allowed to save:
-
electric power – 166 440,0 kWh/per year;
-
funds- 47 000 UAH/per year;
|
|
|
|
Energy audit of sewage and water purifying systems.
The contract value makes
3 000,00 USD
The customer is
Oblast’ Municipal water supply and sewerage Economy “Myrgorodvodokanal”.
The contractor is
“ESCO-Rivne” CSJV.
The Contract’s implementation has allowed
to determine the immediate energy saving measures of sewage and water purifying systems.
|
|
|
|
Providing services ensuring energy saving effect.
The contract value makes
4 200,00 USD
The customer is
“Teplotransservis” Daughter Enterprise of “Komunenergia” DHC.
The contractor is
“ESCO-Rivne” CSJV.
The Contract’s framework the following activities were performed:
-
Project site technical monitoring;
-
Assessment and consultation on power equipment efficient usage;
-
Achieved effect verification;
-
Heat supply optimization for fuel economy and GHG emission reduction.
|
|